Big Valley ICF House
2017
View Gallery
The Hideout
November 2010
  • Framing on the main floor, mezzanine and 2nd floor offices.
  • Designed the timber frame for the bar, installed the timber framing, built bar walls and installed the bar counter top.
  • The bar top is an 1000 year old Douglas fir from Kootenay, BC. The timber framing is also from Kootnenay and is almost know free Fir AKA “clear Fir”.
  • Installed all wood beams, wood panelling, bathroom stalls and trim work.
View Gallery
Modular Home Conversion
September 2009

This modular home was given a new lease on life with a basement and home addition, plus a beautiful interior renovation.

View Gallery
Gull Lake Custom ICF Home
June 2016
View Gallery
Red River Building @ 5589-47st Red Deer
2017

-14,000 sq ft of finished space
-3000 sq ft Organic Food Store and Cafe on Main floor
-Elevator install
-4 Apartment Suites
-Massage Clinic on 2nd floor
-6 Commercial Lease bays
-11 Individual Fan Coils for Heat & A/C
-Exterior platform for 15 condensing units
-14 month Construction Time

View Gallery
Riverside Kennels and Alberta Animal Services Addition
July 2014
  • 2nd floor added to existing building
  • New truss & roof for Dog Kennels w/ R-50 attic insulation
  • 9 Skylights for natural light in Kennel areas
  • More office space
  • Improved Cat room
  • Vet & Surgery Space
  • 7 month construction time
View Gallery
Award Winning ICF Home in Delburne
June 2015

– 10 month build time
– 5400 sq ft of Finished Space
– Front walk out w/ concrete retaining wall
– 2 sets of Curved stairs
– Over 160 cubic yards of concrete

View Gallery